Mechanical Engineering Faculty Research
Title
Scheduling and Process Planning for Multiple Material Stereolithography
Document Type
Article
Publication Date
2010
Abstract
– To operate a multiple material stereolithography (MMSL) system, a material build schedule is required. The purpose of this paper is to describe a scheduling and process‐planning software system developed for MMSL and designed to minimize the number of material changeovers by using low‐viscosity resins that do not require sweeping.
Publication Title
Rapid Prototyping Journal
Volume
16
Issue
4
First Page
232
Last Page
240
Recommended Citation
Kim, Hochan; Choi, Jae-Won; and Wicker, Ryan, "Scheduling and Process Planning for Multiple Material Stereolithography" (2010). Mechanical Engineering Faculty Research. 363.
https://ideaexchange.uakron.edu/mechanical_ideas/363